GB 19239-2022 Translated English of Chinese Standard (GB 19239-2022, GB19239-2022): Installation specification for gas system of gas vehicles [Buy--download True-PDF in 3-second: https://play.google.com/books > Sign in > This BOOK > "3-dots" > Export > Save as "*.pdf"]https://www.chinesestandard.net, 2022 M12 9 - 15 páginas This document specifies the installation requirements, test methods, inspection rules and implementation transition period of the gas system of gas vehicles. |
Dentro del libro
Resultados 1-5 de 10
Página 3
... installation of LNG cylinder vehicle are added (see 4.2.4); ---The strength requirements for gas cylinders and gas cylinder sets after installation are modified (see 4.2.5; 4.2.4 of GB 19239-2013 and 4.2.2.4 of GB/T 20734-2006); ---The ...
... installation of LNG cylinder vehicle are added (see 4.2.4); ---The strength requirements for gas cylinders and gas cylinder sets after installation are modified (see 4.2.5; 4.2.4 of GB 19239-2013 and 4.2.2.4 of GB/T 20734-2006); ---The ...
Página 4
... cylinders and the test methods for the gas cylinder sets are added (see 5.3.2; 5.3.2 of GB 19239-2013 and 6.2 of GB/T 20734-2006); ---The requirements for the installation strength test of gas (liquid) refueling ports are modified (see ...
... cylinders and the test methods for the gas cylinder sets are added (see 5.3.2; 5.3.2 of GB 19239-2013 and 6.2 of GB/T 20734-2006); ---The requirements for the installation strength test of gas (liquid) refueling ports are modified (see ...
Página 6
Alcanzaste el límite de visualización de este libro.
Alcanzaste el límite de visualización de este libro.
Página 7
Alcanzaste el límite de visualización de este libro.
Alcanzaste el límite de visualización de este libro.
Página 8
Alcanzaste el límite de visualización de este libro.
Alcanzaste el límite de visualización de este libro.
Contenido
Foreword | 6 |
The requirements for the transition period of the implementation of this document | 7 |
Scope | 8 |
Test Methods | 10 |
Inspection Rules | 14 |
Implementation Transition Period | 15 |
Términos y frases comunes
acceleration of 5g actual installation mode Adjust the force Air-tight Test applied force carburetor Category-N2 cylinder is installed cylinder or gas direction is 5g displacement data draw the force-displacement driver’s cab exit-factory inspection items fastening belt fix the test fixing seat flame retardant foaming liquid force and displacement force application force applying mechanism force applying point fuel switch gas cylinder set gas liquid Gas supply gas system gas vehicles heat sources increase the installation installation method Installation Strength Test LNG cylinder LNG system longitudinal acceleration LPG system leakage method specified original vehicle passenger compartment QC/T rated working pressure record the force refueling device Refueling Port relation curve requirements of Chapter satisfy the requirements single gas cylinder specified in 5.1.4 stop the force system leakage test system of gas test device Test method test piece tested in accordance vehicles shall satisfy vehicles shall withstand ventilation port vertical downward direction